DesignVerdictBeta
← Back to search
Contested design 005807179-0004

Other appeal · Board of Appeal · 2019-06-13

R0573/2019-3

Contested design: 005807179-0004

CDRAppellant: applicant

Outcome

Appeal dismissed

The appeal is dismissed.

Show verbatim operative text(de)

Die Beschwerde wird zurückgewiesen.

CostsNot specified

Parties

Applicant · invalidity challenger

The KaiKai Company Jaeger Wichmann GbR; vertretungsberechtigte Gesellschaftervia PDF extraction

Germany (DE)

Wilhelm-Riehl-Strasse 13, D-80687 München, Deutschland

Holder · RCD owner

No opposing holder — Other appeal · Board of Appeal.

Legal grounds invoked

Article 41(1)

Argument summary

  • Appellant (design applicant) claimed a 12-month priority period for its GGM application (filed 24 October 2018) based on an earlier PCT patent application (filed 26 October 2017), arguing that Article 4 Paris Convention permits a 12-month priority period from a patent application to a subsequent design application.
  • No opposing private party; ex parte appeal against the examiner's rejection of the priority claim.
  • The Board held that Article 41(1) GGV unambiguously limits the priority period for Community design applications to six months; a PCT application may qualify as a prior filing under that provision (treated as utility model) but cannot extend the period beyond six months; the PVÜ does not provide for a patent application to ground priority for a subsequent design application.
  • The appeal was dismissed; reimbursement of the appeal fee was refused.

Deciding panel

  • ChairTh. M. Margellos
  • RapporteurE. Fink
  • MemberC. Bartos
  • RegistrarH. Dijkema

Decision files

LanguageTypeSource link
enEnglish (en)machine translatedDownload original from EUIPO ↗
frfrançais (fr)machine translatedDownload original from EUIPO ↗
deGermanoriginalDownload original from EUIPO ↗

Similar decisions

Ranked by shared Locarno class + shared legal grounds + matching outcome. Click a case to view full detail.

CaseDateOutcomeShared groundsLocarnoScore
R0573/2019-32019-06-13Decision confirmedArt 41(1)5
R0573/2019-32019-06-13Decision confirmedArt 41(1)5
R0573/2019-32019-06-13Decision confirmedArt 41(1)5
R0573/2019-32019-06-13Decision confirmedArt 41(1)5
R0573/2019-32019-06-13Decision confirmedArt 41(1)5
R0573/2019-32019-06-13Decision confirmedArt 41(1)5
R0573/2019-32019-06-13Decision confirmedArt 41(1)5
R0573/2019-32019-06-13Decision confirmedArt 41(1)5